PALLET OF NBM5030 AUTOMATIC HOLLOW BLOCK AND PAVER STONE MACHINE
It is the wooden pallet which produces 30 pcs interlocks and 12 pcs (20x40x20) blocks in one press.
PALLET OF NBM5030 SEMI AUTOMATIC HOLLOW BLOCK AND PAVER STONE MACHINE
It is the wooden pallet which produces 30 pcs interlocks and 12 pcs (20x40x20) blocks in one press.
SEMI AUTOMATIC
Required space in semi-automatic systems: Minimum 4000 m2 (400 m2 for machinery and equipment, 2000 m2 of drying area, 1000 m2 of dry ready storage area, 500 m2 of aggregate storage area, empty pallet holding area of 100 m2) The total transformer or generator power required to be installed in semi-automatic systems must be 85 kVA. The installed capacity is 60 kw. Number of personnel required to operate the factory in semi-automatic systems: 9 people (2 operator and 1 wooden pallet drive, 3 fresh product carriers, 3 aggregate feeders).
FULL AUTOMATIC
Required area of installation in automated systems: Minimum 4000 m2 (600 m2 for machinery and equipment, 1600 m2 of dry area, dry ready storage area 1200 m2, aggregate storage area 500 m2, empty pallet holding area 100 m2) The total transformer or generator power required to be installed in automatic systems must be 110 kVA. The installed capacity is 85 kw. Number of personnel required to operate the factory in automatic systems: 3 people (2 operators and 1 forklift driver). ) )
GENERAL INFORMATION ABOUT THE AREA TO BE ESTABLISHED
NOVAL INC. the machine, empty pallet holding and fresh product drying area in order to protect from bad weather conditions to establish a minimum 600 m2 closed area is recommended. The buyer prepare the concrete infrastructure of the area where the plant will be installed. NOVAL INC. prepare a detailed measurement plan for the area where the infrastructure will be established. The quality of concrete and the loads that it will carry, namely the static calculation and the strength of the reinforced concrete structure, must be carefully calculated and prepared by civil engineers. The electrical installation up to the control panel of the factory belongs to the receiver. It is necessary to have water plant and compressed air compressor and installation to the mixer unit of the factory. In order to start the installation, concrete, aggregate, plumbing and water, concrete suitable for the concrete project, at least 500 lt capacity compressed air compressor, forklift, bucket, telescopic crane with at least 10 tons lifting capacity, power and distributor electrical panel with the desired power and with this the technicians ( operators )will be ready to operate the equipment. Personnel assigned by the vendor at the time of installation to comply with the rules of occupational safety and health (electrical and electrical equipment provided with grounding and isolation, machine and machinery with safe and suitable hand tools, safe scaffolding and platforms, etc.) and work safety equipment (helmet, steel nose and the soles of electrical conductive rubber shoes, suitable to work in high places with safety belt, etc) to keep the work done in this installation in terms of occupational health and safety in terms of supervision and control of the emerging problems as soon as possible.