FULLY AUTOMATIC
FULL automatic systems required plant area: Minimum 6500 m2 (1000 m2 for machinery and equipment, drying area 2200 m2, dry ready storage area 1800 m2, aggregate storage area 1200 m2, empty pallet holding area 300 m2) The total transformer or generator power required to be installed in FULL automatic systems must be 250 kVA. The installed capacity is 160 kw. Number of personnel required to operate the factory in FULL automatic systems: 2 persons (operator and FORKLIFT).
FULL AUTOMATIC
Required area of installation in automated systems: Minimum 6500 m2 (1200 m2 for machinery and equipment, drying area 2000 m2, dry ready product storage area 1900 m2, aggregate storage area 1000 m2, empty pallet holding area 400 m2) The total transformer or generator power required to be installed in automated systems must be 200 kVA. The installed capacity is 125 kw. Number of personnel required to operate the factory in automatic systems: 3 people (2 operators and 1 forklift driver).
GENERAL INFORMATION ABOUT THE AREA TO BE ESTABLISHED
NOVAL INC. the machine, empty pallet holding and fresh product drying area in order to protect from bad weather conditions to establish a minimum 1000m2 closed area is recommended. The buyer prepare the concrete infrastructure of the area where the plant will be installed. NOVAL INC. prepare a detailed measurement plan for the area where the infrastructure will be established. The quality of concrete and the loads that it will carry, namely the static calculation and the strength of the reinforced concrete structure, must be carefully calculated and prepared by civil engineers. The electrical installation up to the control panel of the factory belongs to the receiver. It is necessary to have water plant and compressed air compressor and installation to the mixer unit of the factory. In order to start the installation, concrete, aggregate, plumbing and water, concrete suitable for the concrete project, at least 1000 lt capacity compressed air compressor, forklift, bucket, telescopic crane with at least 20 tons lifting capacity, power and distributor electrical panel with the desired power and with this the technicians ( operators )will be ready to operate the equipment. Personnel assigned by the vendor at the time of installation to comply with the rules of occupational safety and health (electrical and electrical equipment provided with grounding and isolation, machine and machinery with safe and suitable hand tools, safe scaffolding and platforms, etc.) and work safety equipment (helmet, steel nose and the soles of electrical conductive rubber shoes, suitable to work in high places with safety belt, etc) to keep the work done in this installation in terms of occupational health and safety in terms of supervision and control of the emerging problems as soon as possible